(KTNC)--More positive news coming from near Elk Creek, where the Canadian company considering developing a niobium mine continues to encounter a high-grade level of the material.
NioCorp president Peter Dickie says they are working on several fronts, both on-site and off-site to get a mine off – or into – the ground.
On-site, he says they have three drill rigs going now, two producing core that goes into a variety of technical reports. He says they're hitting some "very high grade material" that they had not anticipated, even in their best-case scenario. He says they've encountered grades of three to four percent niobium.
Off-site work includes geo-technical testing, which will determine what a mine might look like both above and below ground, and metallurgical testing, which Dickie says is progressing very well.
That will go into the engineering work to establish the infrastructure for a mine to extract the niobium from beneath the ground.
Alls the reports will also be included in what Dickie calls a “bankable feasibility study” that will be completed in the first quarter of 2015.
NioCorp CEO Mark Smith says in a news release that they're negotiating for pilot plant work to begin as soon as possible.
© Many Signals Communications
MOST VIEWED STORIES
Fatal Missouri crash claims Atchison man
Brown Co Commissioner plans to resign
Five injured, including two critically, in St. Joseph crash
Troy man convicted of sexual battery
Man arrested in Brown Co subject to deportation
Motorcyclist killed in Washington Co crash
Two hurt, one cited, in Atchison wreck
Actress, filmmaker plans Benedictine College visit
Man arrested after armed carjacking in St. Joseph
A Saturday of celebrations planned in Atchison
Two local cooperatives announce merger agreement
ATCO Sheriff seeks hit and run driver
Richardson County Fair royalty crowned
Two local lakes added to public health advisory list
Flags fly in KS for political violence remembrance
McLouth man injured in Leavenworth Co wreck
LATEST STORIES
Trio arrested after Jackson Co traffic stop
Boil order for Village of Nemaha lifted
Mayetta man jailed on drug and weapons charges
Brown Co Commission moves closer to finalizing budget
Two local cooperatives announce merger agreement
ATCO clarifies Sunday budget hearing date
Repair works means closure for VF boat ramp parking lot
Doniphan Co 2026 county budget adopted
RELATED STORIES
Elk Creek Niobium Project Test Results Better Than Expected
Elk Creek Niobium Deposit Larger than Expected
Initial Results at Elk Creek Mine Site called Encouraging
NioCorp Confident in Elk Creek Mine Prospects
Work Continues at Proposed Mine Site near Elk Creek
NioCorp Pleased with Latest Test Results from Elk Creek Site
NioCorp Meeting Planned for Wednesday Evening