Keystone Pipeline Temporarily Shut Down
KANSAS CITY, Mo. (AP) - A federal agency says TransCanada Corporation has temporarily shut down its existing Keystone pipeline after tests showed "possible safety issues."
The Pipeline and Hazardous Materials Safety Administration says TransCanada reported shutting down the about 21-hundred mile pipeline, which moves about 500,000 barrels of crude a day from Alberta, Canada, to facilities in Illinois and Oklahoma. The pipeline passes through four northeast Kansas counties—Marshall, Nemaha, Brown and Doniphan-- in route to Wood River, Illinois.
Jeannie Layson, spokeswoman for PHMSA, says the possible safety issues were found on part of the pipeline that extends between Missouri and Illinois. Layson says in an email that an agency inspector has been sent to review the test results, observe repairs and follow any necessary safety activities.
She says TransCanada hasn't reported any leaks on the system.
© Associated Press
MOST VIEWED STORIES
Hartman earns prison in embezzlement sentencing
Brown, Doniphan, Jackson & Nemaha Co election results
Falls City Foods closing local facility
Two felony theft suspects arrested after two-state pursuit
Nortonville woman killed in wrong-way crash
Voters oust incumbents in Atchison school board race
Sabetha man facing multiple charges
2025 Hiawatha Halloween Queen named
Former tribal chair earns decade in federal prison
Boil water advisory: part lifted, part remains in place
Leavenworth man killed in crash
Man injured in Jackson Co vehicle-deer collision
Atchison teen injured in motorcycle crash
Hiawatha Halloween Frolic Friday
KDHE issues revised Boil Water Advisory for Atchison Co RWD 5C
KDOT to host open house for U.S. 75 expansion study
LATEST STORIES
Pawnee County K9 officer resigns
Boil water advisory lifted for Doniphan Co RWD 3
Falls City Council approves resolution on land acquisition
Tribe responds to former Chair's prison sentence
Write-in candidates win Horton City, school board positions

Printer Friendly
Email to a Friend





